Isabel Mining Jetty Ushered In The First Ship Bert
On April 29th, the capital base colleagues spent 14 hours to overcome the difficulties and filled the barge KISME 13 with materials.
Due to adequate loading schedule, the 120-foot wide and 40-foot barge decks is basically filled up.
Due to the unpredictable weather, the No. 1 strong wind warning of Solomon
Meteorological Department was received at 9 o'clock in the evening before the departure. For the safety of people and goods, the colleagues disregarded the fatigue and all dispatched on board for secondary tying lashing.
The ship arrived safely at the jetty of the SUMA camp at 5pm on the 30th.
Colleagues in the mining camp have been waiting at the dock for a long time and the unloading work is ready.
“Colleagues from multinational teams” coordinated actions, worked overtime, and unloaded overnight.
Due to adequate loading schedule, the 120-foot wide and 40-foot barge decks is basically filled up.
Due to the unpredictable weather, the No. 1 strong wind warning of Solomon
Meteorological Department was received at 9 o'clock in the evening before the departure. For the safety of people and goods, the colleagues disregarded the fatigue and all dispatched on board for secondary tying lashing.
The ship arrived safely at the jetty of the SUMA camp at 5pm on the 30th.
Colleagues in the mining camp have been waiting at the dock for a long time and the unloading work is ready.
“Colleagues from multinational teams” coordinated actions, worked overtime, and unloaded overnight.
撰写:Zhang, Leslie
摄影:刘铭,李波
单位:新亚矿业. New Asia Mining